![]() Project improvements include milling and resurfacing the existing roadway some minor widening will occur along northbound and southbound SR 76/Kanner Highway upgrading crosswalks and curb ramps to meet Americans with Disabilities Act (ADA) standards installing sidewalks, signage and pavement markings upgrading pedestrian lighting at two signalized intersections at SR 714/Monterey Road and SR 5/U.S. 1 in the City of Stuart will began on Monday, July 25, 2022. State Road 76/Kanner Highway Resurfacing Projectĭescription: This 1.4-mile resurfacing project from north of Cabana Point Circle to SR 5/U.S. For more information, contact Community Outreach Specialist Samantha Kayser at 77.ģ. ![]() to 4 p.m., for lighting and signalization work. Lucie County line will be closed Monday, Jan. 1 from NW Jensen Beach Boulevard to the Martin County/St. One lane in each direction on SR 5/U.S.Lucie County Line upgrading curb ramps to meet American with Disabilities Act (ADA) standards and upgrading pedestrian signals, intersection lighting, pavement markings, and signing to current standards.Ĭost/Completion: $3,071,783.35. Project improvements include milling and resurfacing the existing roadway adding bicycle lanes within the project limits: 5-feet wide from SR 732/NW Jensen Beach Boulevard to NW Sunset Boulevard and 7-feet wide from NW Sunset Boulevard to the Martin County/St. Lucie County line began on Monday, May 2, 2022. Highway 1 Resurfacing Projectĭescription: This 1.426-mile resurfacing project from SR 732/NW Jensen Beach Boulevard to the Martin County/St. For more information, contact Community Outreach Specialist Samantha Kayser at 77.Ģ. During this time, intermittent side street closures may occur, and two-way traffic will be maintained by a flagging operation. 5, one lane in either direction of SR 714/SW Martin Highway from Citrus Boulevard to Martin Downs Boulevard may be closed, Sunday through Thursday, between 7 p.m. Advance Notice: Beginning Sunday, Feb.Cyclists and motorists should share the road. The eastbound and westbound shoulders on SR 714/SW Martin Highway from SW Martin Downs Boulevard to SW Citrus Boulevard are closed through mid-2024 to facilitate widening activities.Project improvements include widening SR 714/SW Martin Highway from a two-lane undivided rural roadway to a four-lane divided urban roadway, widening the bridge over Florida’s Turnpike, constructing seven-foot buffered bike lanes and six-foot sidewalks on both sides of the roadway, and installing signing, signalization, and lighting upgrades.Ĭost/Completion: $21.3 million. State Road 714/SW Martin Highway Widening Projectĭescription: This 1.127-mile widening project began on Aug. (Hobe Sound, Palm City, City of Stuart, Stuart, Jensen Beach, Jupiter Island, Port Salerno, Rio, Indiantown, Tequesta, Town of Sewall’s Point)ġ. Treasure Coast - Monday January 30, 2023: The Florida Department of Transportation (FDOT) reports that Treasure Coast traffic will be affected this week by ongoing construction projects and maintenance work in Martin, St.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |